Pass Judgement

Passive houses have long been considered the ultimate in low energy buildings. So when it comes to BERs, why don’t they always get a straight A? Lenny Antonelli investigates.
Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus.
The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction.
While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance.
Dip in, and enjoy!

Passive houses have long been considered the ultimate in low energy buildings. So when it comes to BERs, why don’t they always get a straight A? Lenny Antonelli investigates.

Archie O’Donnell, projects coordinator for Éasca and the Irish Passive House Association
Architect Paul Leech explains why the new Navan Credit Union is arguably Ireland’s most innovative sustainable building to date, and outlines his hopes that the experience gained from this project can help the construction industry to realise sustainable building in Ireland.
As more and more people upgrade their homes to make them more energy efficient, it’s crucial for them to consider installing some sort of ventilation system to keep them healthy. Astrid Madsen compares heat recovery ventilation to a relative newbie on the Irish market, demand controlled ventilation.

Two years ago Construct Ireland ran a case study on Mater Orchard, a Mercy Sisters convent building that successfully balanced cutting edge technologies with pragmatic green design. Such was the success of that building, its architects were commissioned by Mercy Sisters in Limerick to repeat the feat. John Hearne visited the freshly completed building to find out how they fared

G rated Limerick semi-d upgraded to A3 with full envelope & heating system upgrade

Whilst great strides are being made in upgrading energy performance requirements under Part L of the Building Regulations, the issue of ventilation has remained largely ignored by legislators for years, leaving designers with antiquated standards to work to. At its worst, efforts to air-tighten and increase the insulation of homes is being undermined by the absurd practice of knocking holes in walls. John Hearne looks into what changes need to be made to modernise Part F.

With the threats posed by anthropogenic climate change now accepted as a key international issue, efforts to curb carbon dioxide emissions are becoming manifest around the world in spite of – and even as a response to – the global recession. But any such efforts may be in vain if the focus on carbon dioxide distracts from the need to curtail methane emissions, as Richard Douthwaite explains
In
issue 2 we reported on an innovative new energy bike scheme being
implemented in Sligo. Its instigator, Wilhelm Bodewigs, got in touch to
tell us about an interesting Tram system proposal for the county

Adding to the list of developers aiming to deliver energy efficient housing, Cronan Nagle Construction are currently on site with 188 highly insulated, airtight homes in Ennis, co. Clare. The development, which also incorporates heat recovery ventilation and condensing gas boilers is surpassing the thermal requirements of Building Regulations by up to 45%, as John Hearne discovers.