Energy Auditing

An indepth look at the forthcoming Directive on the Energy Performance of Buildings by Jeff Colley.
Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus.
The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction.
While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance.
Dip in, and enjoy!


Box-like, small windows, primary colour renders - there is a common misconception that building to the passive house standard involves sacrificing design freedom for the sake of thermal performance. Not so, argues passive house guru Tomás O’Leary of MosArt and the Irish Passive House Academy, as his selection of architecturally diverse buildings reveals.

John Hearne spoke to a number of independent energy experts to develop an impartial view of the main sustainable heating options.


Imaginosity, the new children's museum building in Sandyford's Beacon South Quarter development, is getting the Austrian eco-house treatment, combining low energy, modular construction with a plethora of low carbon energy technologies. Jason Walsh visited the site to take a look.
Bank of America Tower, to be located at One Bryant Park in midtown Manhattan is a US$1 billion project that has been designed to be one of the most highly efficient and ecologically friendly tall buildings in the world. The building, currently under construction, is expected to be complete in 2008.
Jason Walsh got in touch with Cook + Fox Architects in New York, designers of the Bank of America Tower to see how the practice plans to square the circle of designing an environmentally sound high-rise building.

As the January 2006 deadline for implementation of the EU Directive on the Energy Performance of Buildings draws ever nearer, the Irish Government has spelt out its plans to delay the across the board introduction of building energy ratings until 2009. But how does this compare to other EU Member States?

In light of the failure of AER 5 and the widespread pessimism in the wind industry regarding converting AER 6 contracts into operating wind farms, we asked the six main political parties what their proposals are for the development of an Irish wind industry.

Earlier this year constructireland.ie broke the news of the introduction of the pilot Home Energy Saving Scheme, a new grant funding programme designed to stimulate the en masse refurbishment of Ireland’s poorly performing existing housing stock. John Hearne travelled to one of the pilot areas to see how the scheme is working on the ground, and discover how the scheme is developing.