From the Construct Ireland archives


Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus. The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction. While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance. Dip in, and enjoy!

True to Form

0305-lowenergyICFtitle.jpg
Adding to the list of developers aiming to deliver energy efficient housing, Cronan Nagle Construction are currently on site with 188 highly insulated, airtight homes in Ennis, co. Clare. The development, which also incorporates heat recovery ventilation and condensing gas boilers is surpassing the thermal requirements of Building Regulations by up to 45%, as John Hearne discovers.

Deconstruct Ireland

Deconstruct Ireland
The environmental impact of the built environment extends far beyond energy consumption and carbon emissions throughout a building’s intended lifespan. Architect and sustainable design consultant Sinéad Cullen of DW EcoCo & BE Architecture explains why there’s a need to design buildings that can be deconstructed rather than destroyed once they reach their end of life, and looks at the obstacles to be overcome to make this happen.

Energy Labels

0209energyratingtitle.jpg
As Construct Ireland goes to press, the construction industry awaits Ministers Dick Roche and Noel Dempsey to sign off the long overdue timetable for implementing the Energy Performance of Buildings Directive, a piece of legislation set to make energy performance a key factor in property sales. But can Ireland train up enough auditors to label buildings by January 2006?

A Breath of Fresh Air

O310-BreathOfFreshAirTITLE.jpg
Prestige commercial buildings can place a heavy toll on the environment, typically relying in Ireland on carbon intensive grid electricity to power air conditioning systems throughout the warmer parts of the year and inefficient electric lighting – often all year around. Completed in November 2004, software company SAP’s Galway offices offer a rare opportunity to find out how a natural ventilated and low energy lighting building is working in practice, as John Hearne reveals.

Opinion

Opinion
If you’re not assessing the environmental performance of your suppliers and their products, it’s rapidly becoming a case of “caveat emptor”. Many of the world’s biggest companies are now buying green, and the Irish government is about to follow suit. Ignore the issue and you put your company at a competitive disadvantage, argues Brian O’Kennedy, managing director of Clearstream Solutions

Graham Group's green HQ

Graham Group
Completed in December 2009, Graham Group’s new headquarters reveal the construction and asset management company’s commitment to green building. The project’s sustainability adviser, Chris Croly of BDP describes an innovative design that pushes the boundaries of natural ventilation and takes a thoughtful approach to materials and buildings services to ensure a minimal environmental impact.

Sustainability or bust

Sustainability or bust
As if the implications of the unfolding global financial crisis weren’t bad enough, the Irish economy must also contend with the consequences of a banking system exposed to unprecedented property-related debts. Reflecting on the ongoing crisis, Richard Douthwaite explains why investment in local energy innovation may prove the key to improving Ireland’s economic health

Under rated

Under Rated
Mandatory for virtually all building types since January of this year, Building Energy Ratings have been met with little fanfare. Construct Ireland proposes a cost-free method of levelling the marketplace by ensuring compliance and increasing awareness of the BERs legal status. Jason Walsh explains.

Mixed Signals

As it nears completion, John Hearne visits what is anticipated to be one of the lowest energy buildings in Ireland's recent history.

Access All Areas

0204disacctitle.jpg
A little foresight at the design stage can go a long way in determining a building’s success. If a building’s design fails to take into consideration the needs of any potential occupants and users, the risk of the need for corrective work, often at considerable cost, is greatly increased.
Construct Ireland’s Architecture Correspondent Lauren Kapusta reports